Heron Hall Academy, Enfield

This is one of two projects in Enfield, an outer London Borough with a diverse population and where there has been an increase in school age children living in the area. This secondary academy required an additional sports hall and a complete new IT block. Due to the length of the build, some construction took place during the term time while students were on the premises. Particular consideration was given to:

  • Health and safety of the site and students.
  • Timings of deliveries and trucks.
  • Ensuring the site was separated from the school and inquisitive students.
  • Liaising with the staff to minimise disruptions to lessons from heavy or noisy work.

This £8m project was commissioned by the London Borough of Enfield and took 8 months to complete.